Environmental Clearance is mandatory approval from the Ministry of Environment, Forest and Climate Change (MoEFCC) or State Environment Impact Assessment Authority (SEIAA) before starting certain projects.
Environmental Clearance (EC)
-
Mandatory approval under EIA Notification, 2006 for certain industries/projects.
-
Issued by MoEF&CC / SEIAA based on project size and category.
-
Ensures environmental impacts are assessed and mitigated before starting operations.
GPCB / SPCB NOC
-
Consent to Establish (CTE): Required before construction/setup of the unit.
-
Consent to Operate (CTO): Required before starting operations.
-
Issued by State Pollution Control Board (e.g., GPCB in Gujarat).
-
Ensures compliance with air, water, and noise pollution norms.
Waste Management Compliance
-
Proper handling, storage, treatment, and disposal of:
-
Solid Waste
-
Hazardous Waste
-
E-waste / Plastic Waste / Bio-medical Waste (as applicable)
-
-
Authorization from SPCB required.
-
Maintain records, manifests, and submit periodic returns.
If you want, I can tailor this industry-specific (manufacturing, construction, pharma, MSME, etc.) or convert it into a proposal / tender / compliance note.
